Computerized flat knitting machines. More are being added.
Reliable production
needs visible control.
A practical view of the factory supply relationship: the operating facts we can share today, the checks agreed for each order and the way exceptions are handled.
Approximately 3 million knitted garments produced annually.
Proposed management target, not a historical result.
Proposed target for first inspection, not a historical result.
Confirm the start/end milestones by style, quantity, materials and schedule.
Selected around the design and hand feel.
30 pieces per colour.
Annual production output reflects the company profile. Delivery and first-pass targets are proposed goals, not results from the previous 12 months.
Operating goals for the next 12 months.
These are proposed monthly targets. They are not historical performance results.
| Plan month | On-time completion target | First-pass product target | Plan month | On-time completion target | First-pass product target |
|---|---|---|---|---|---|
| M01 | ≥95% | ≥97% | M07 | ≥95% | ≥97% |
| M02 | ≥95% | ≥97% | M08 | ≥95% | ≥97% |
| M03 | ≥95% | ≥97% | M09 | ≥95% | ≥97% |
| M04 | ≥95% | ≥97% | M10 | ≥95% | ≥97% |
| M05 | ≥95% | ≥97% | M11 | ≥95% | ≥97% |
| M06 | ≥95% | ≥97% | M12 | ≥95% | ≥97% |
On-time rate = orders completed by their due date ÷ orders due. Product pass rate = units passing first inspection ÷ units first inspected.
Customer request → Factory solution → Final result
Illustrative measurement issue and proposed response. The specific order, date and inspection records still require factory verification.
Customer request
A bulk inspection found part of the chest measurement outside the customer’s permitted tolerance.
Factory solution
Knitted-panel density and the finishing process were not being controlled consistently.
The affected batch was paused, the process was adjusted, and the garments were re-inspected and reworked.
Result and prevention
The batch passed the agreed customer requirements after the corrective work.
Prevention: Add first-piece post-wash measurement approval and in-line density checks during production.
Agree the checks
before the pressure.
- Approved measurements and tolerance
- First-piece and post-wash confirmation
- Yarn, gauge, colour and hand-feel reference
- Inspection scope and delivery schedule
We will turn your requirements into a project-specific production and inspection plan.
Discuss production requirementsLet’s make something
uniquely yours.
A sketch, a sample, or simply an idea.
Tell us where you’d like to begin.